Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Tuesday, June 9
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
MPNEWSMPNEWS
Home»News»State says terminal plan to go ahead
News

State says terminal plan to go ahead

By Keith PlattSeptember 12, 2023Updated:July 16, 2024No Comments2 Mins Read
Facebook Twitter LinkedIn Reddit Threads Email Copy Link
Share
Facebook Twitter LinkedIn Pinterest Email

THE state government has announced that a terminal to assemble offshore wind turbines will be built at Hastings while at the same time saying there will be “a thorough environment effects statement (EES) process” before the project progresses.

In a statement issued on Sunday (10 September) the government says the terminal will be built at the Old Tyabb Reclamation Area and be equipped “for the receival, assembly and installation of offshore wind foundations, towers and turbines as a multi-user facility, with new berths, heavy duty pavements and major supporting infrastructure”.

Energy and Resources Minister Lily D’Ambrosio and Ports and Freight Minister Melissa Horne have visited the Port of Hastings “for a first look at the area where the terminal will be built”.

“The Port of Hastings has been selected as the most suitable port to assemble offshore wind infrastructure – with the benefits of large areas of zoned land it is close to existing port precincts, has deep water channels and is close to the offshore wind projects off the coast of Gippsland,” the statement containing quotes from the two ministers states.

“The terminal will undergo a thorough environment effects statement (EES) process allowing the community to make submissions before the project progresses.”

The statement says $27 million included in the 2023/24 state budget “will help create thousands of jobs, generate billions of dollars in investment and create renewable, reliable power for all Victorians from offshore wind farms”.

“This project will give industry further confidence to kick-start renewable energy projects and deliver thousands of ongoing job opportunities for Victorians in our renewable energy future,” Horne said.

“Offshore wind is a key pillar of Victoria’s renewable energy future. It will create thousands of jobs, generate billions in investment and provide more reliable power for all Victorians.” D’Ambrosio said.

The statement does not mention concerns already raised about the environmental effects dredging or onshore development might have on Western Port or further afield (“Terminal delays could hit power targets” The News 22/8/23).

Jeff Weir, executive director of the Hastings-based Dolphin Research Centre, said questions needing to be addressed included the effects of dredging (including to adjacent coastlines”); effects on wildlife (including “exotic wildlife species”); treatment for stormwater runoff; and how many ships would be using the terminal and if that would happen during the day and night.

First published in the Western Port News – 13 September 2023

Hastings Mornington Peninsula

Related Posts

Hundreds Gather for Reconciliation Family and Allies Day

June 9, 2026

Rosebud op shop’s mission to house families in need

June 6, 2026

New train station up and running

June 5, 2026

My brother died peacefully, and in the manner he chose

June 5, 2026
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

8 Birdwood Avenue, Mornington.

Property Of The Week May 19, 2026
Council Watch

Ratepayers foot the bill for public waste costs

April 20, 2026

Shire reforecasts budget after $8.2m shortfall

April 9, 2026
100 Years Ago This Week

Attempt to blow up safe in Stony Point burglary

June 4, 2026
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.