Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Sunday, June 29
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»Community to have say on telco shelter
News

Community to have say on telco shelter

By Brendan ReesMay 14, 2025Updated:May 20, 2025No Comments3 Mins Read
OPTUS’ existing infrastructure at Citation Reserve, Mt Martha. Picture: Yanni
Share
Facebook Twitter LinkedIn Pinterest Email

MORNINGTON Peninsula Shire councillors have given their approval for a proposal by Telstra to install an equipment shelter next to existing telecommunications infrastructure in Mt Martha, subject to community consultation. Under the proposal, the shire would lease a 30 square metre site to Telstra to install a monopole and equipment shelter at Citation Reserve on Nepean Hwy. The infrastructure would be adjacent to an existing Optus monopole, with Optus’ lease to be varied to allow for the co-location.
Councillors voted unanimously in favour of the proposal at their 7 May meeting.

A report will come back to council once community engagement is undertaken to consider any submissions received and to determine whether to proceed with the lease agreements – which would both expire in March 2029. The proposed lease area is six metres by five metres, with the site to be fenced to prevent unauthorised access.

The shire’s current rent return on the Optus infrastructure is $39,291.77 annually while the Telstra equipment shelter would yield $19,000 per year in rent. According to a shire report, the lease variation would be aligned with existing lease terms, “ensuring consistent management of telecommunications infrastructure within the reserve”. “The proposal is subject to planning permits, which Telstra is responsible for obtaining prior to the signing of the lease. This report provides an objective assessment of the proposal, including lease arrangements, site suitability, and compliance with relevant regulations,” it said.

The report also noted that the proposal would benefit the peninsula’s mobile phone network during peak holiday seasons, which “is often unable to cope with demand, resulting in communication blackouts”. “The Mornington Peninsula is one of the most bushfire-prone areas in Victoria. The provision of mobile communications enhances the community and emergency services communication capabilities,” it said.

Cr Bruce Ranken supported the plan as a “stronger mobile network coverage matters to our community, particularly for emergency communications to allow and keep residents and services connected during critical events like bushfires”. “By approving the proposed leases, the council is prioritising the community well-being, economic resilience and smart infrastructure management while respecting their environmental and local planning policies,” he said.

Ranken also used the opportunity to call on telcos to invest in the shire’s digital connectivity plan as the Mornington Peninsula “still suffers numerous mobile black spots, in particular the coastal and bushland areas, high demand tourism zones and fringe and semi-rural communities”.

The new telecommunications infrastructure comes amid frustration from Somerville residents and business owners who have been advocating for a decade to improve mobile phone coverage in their area. Last September, Telstra told The News that it was aware of some indoor coverage challenges in some parts of Somerville, and that it was committed to building a new site in southeast Somerville “to uplift coverage in the area and have a project underway to locate the land required to build a new mobile site”.

Telstra regional general manager Jenny Gray last week said, “We continually investigate new opportunities to further expand our mobile coverage in the region”. “In addition to our proposed new site at Mount Martha, we’re also finalising our plans for another site in Somerville and we expect to lodge our application in the next few months,” she said. “We’re looking forward to delivering improved 4G and 5G coverage and performance in the area.”

First published in the Mornington News – 13 May 2025

Mornington Peninsula Mt Martha Somerville Telsta
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Grand Hotel’s tower revamp signals new chapter for icon

June 26, 2025

Community collaboration brings new studio to life

June 26, 2025

McCrae telco tower refused over visual impact

June 26, 2025

Future on the line for cramped Men’s Shed

June 25, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

14 Bass Street, McCrae

June 3, 2025
Council Watch

Shire secures $3.9m to tackle road safety

June 16, 2025

Kinder flyer flag snub prompts councillors to take over

June 10, 2025
100 Years Ago This Week

Electrification of Trains – Frankston to Mornington Line

June 23, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.