Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Friday, July 4
Breaking News
  • E-bike rider charged following fatal collision in Hastings
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»No quick fix for power grid
News

No quick fix for power grid

By David HarrisonDecember 15, 2015No Comments4 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

COMMENT

UNITED Energy recently letterboxed areas of the Mornington Peninsula with a letter informing householders of the diligent work it is doing in supplying safe and reliable power.

Some readers were less than impressed. Overnight a power cut had set every electronic clock in the district flashing. Again.

Also flashing, at the top of White Hill Rd and at the Red Hill village end of Arthurs Seat Rd, were the large signs advising that power line work was continuing “July to December”.

The month had recently been revised from “November”. Will it become “January” in a week or two?

About this time it was reported that many kilometres of United Energy overhead power lines needed to be replaced on the peninsula because they posed a bushfire risk.

And on December 1 The News reported that “linemen are scrambling to replace up to 30 kilometres of faulty power lines on the Mornington Peninsula amid fears they could cause bushfires”.

Several concerned residents wrote to United Energy stating there was “evidence that the ABC [twisted aerial bundled cable] power lines are faulty and explode periodically causing fires”.

They said a bushfire on 9 November was “a consequence of a failure of your power lines in Main Creek Rd”.

United Energy did not respond to The News before deadline – including questions about the safety of the ABC cable, some of which is barely five years old and said to have faulty insulation.

The company, which is responsible for all the peninsula’s poles and wires, tells a glowing story on its website.

Under the heading “Bushfire mitigation” it states: We are committed to operating our network in full compliance with the requirements of the Act and regulations administered by Energy Safe Victoria (ESV).

“Due to prevailing weather conditions and country environments conducive to bushfires, we acknowledge the need to act proactively in designing and operating our assets to minimise the possibility of a bushfire ignition.

“… [W]e acknowledge our responsibility to the local community to consider all relevant practical technologies available to minimise bushfire risk.”

Its website is silent on problems with its poles and wires. Some wires are estimated to be up to 30 years old.

It is also silent on what is believed to be a growing power supply crisis in the Blairgowrie-Portsea area.

The electricity grid problem coincides with release of a major new study that has found that humans are responsible for some 70 per cent of bushfires in south-east Australia.

The International Journal of Wildland Fund stated that population density explained the fire pattern in NSW and Victoria, the ABC reported.

“The higher the population density the more ignitions you get,” according to lead author Kathryn Collins of the University of Wollongong’s centre for environmental risk management of bushfires.

Official data from more than 113,000 bushfires between 1997 and 2009 across the two states indicated that 47 per cent were from accidental causes such as cigarettes, escaped burn-offs and campfires or sparks from equipment or powerlines.

Forty per cent were deliberately lit and 13 per cent were caused by lightning strikes, the study found.

The cause of 31 per cent of fires was undetermined.

The News reported Nepean MP Martin Dixon saying the Red Hill and Main Ridge power lines came from a “faulty batch that had not lasted as long as they were expected to and had already caused fires” – even though extra insulation was supposed to improve their fire safety capabilities.

The insulation appeared to be perishing quickly and breaking away and exposing the wires, which he described as “a recipe for disaster”.

Mr Dixon, scheduled to get a full briefing from United Energy last week, said he would be seeking to meet Energy and Resources Minister Lily D’Ambrosio and the Ombudsman on the issue.

On Friday afternoon Mr Dixon issued the following: “Further to my statements in the Parliament I have had no response from Minister D’Ambrosio in relation to replacing these faulty cables as a priority, and I am still awaiting a more detailed briefing prior to Christmas from United Energy officers.”

First published in the Western Port News – 15 December 2015

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Advocates celebrate abuse law change

July 3, 2025

Railway station scam

July 1, 2025

Flinders result unaffected by poll blunder – AEC

July 1, 2025

Grand Hotel’s tower revamp signals new chapter for icon

June 26, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

14 Bass Street, McCrae

June 3, 2025
Council Watch

Shire secures $3.9m to tackle road safety

June 16, 2025

Kinder flyer flag snub prompts councillors to take over

June 10, 2025
100 Years Ago This Week

Baxter – On The ‘Wallaby’ with a walking group

July 1, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.