Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Monday, May 18
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
MPNEWSMPNEWS
Home»News»Truck traffic warning for reservoir works
News

Truck traffic warning for reservoir works

By MP News GroupMarch 16, 2016Updated:March 17, 2016No Comments2 Mins Read
Facebook Twitter LinkedIn Reddit Threads Email Copy Link
Share
Facebook Twitter LinkedIn Pinterest Email

OVER the next 12 months Tyabb reservoir will be turned into two independently operating water basins.

The works will allow workers from Melbourne Water to install two linings and covers while the old cover and lining is removed.

The covers and linings are designed to protect the quality of the drinking water piped from Cardinia Reservoir or Tarago treatment plant.

Melbourne Water has warned there will be extensive truck movements 7am-6pm, Monday to Friday.

Approval is being sought for the trucks to operate 7am-1pm on Saturdays.

Bulk earthworks during what’s described as “an intensive period of 60-100 truck movements each day” – will take place between May and August.

Trucks will enter and exit the reservoir along Flood St.

In 1999 the basin received a polypropylene cover, which complied with Melbourne Water’s “closed system standard” on covering service reservoirs. The basin was lined inside with a similar material.

Age and condition mean the existing cover and liner need replacing. Melbourne Water says the works “will ensure the safety and quality of the water is maintained to a high standard”.

The man-made reservoir is 300 metres by 200 metres – or 60,000 square metres – with a total storage capacity of 317 million litres. It was built by the State Rivers and Water Supply Commission in 1978.

Melbourne Water became the owner in 1991.

First published in the Western Port News – 16 March 2016

Related Posts

Cheques presented to airshow beneficiaries

May 15, 2026

Shire all in for inclusion

May 15, 2026

Crime Stoppers call reveals alleged cannabis crop and cache of weapons in Mornington

May 15, 2026

Youth mental health forum to spotlight Peninsula support services

May 14, 2026
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

47A Strachans Road, Mornington

Property Of The Week January 27, 2026
Council Watch

Ratepayers foot the bill for public waste costs

April 20, 2026

Shire reforecasts budget after $8.2m shortfall

April 9, 2026
100 Years Ago This Week

Railway Electrification – Mornington agitation

May 18, 2026
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.