Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Monday, July 27
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Competition
Breaking News
MPNEWSMPNEWS
Home»News»Match us on ramp funding or no deal, says shire
News

Match us on ramp funding or no deal, says shire

By Stephen TaylorNovember 27, 2018Updated:November 27, 2018No Comments3 Mins Read
Facebook Twitter LinkedIn Reddit Threads Email Copy Link
From full house to off-limits: The busy Rye boat ramp during last year’s snapper season and, above, now closed for refurbishment. Pictures: Yanni
Share
Facebook Twitter LinkedIn Pinterest Email
From full house to off-limits: The busy Rye boat ramp during last year’s snapper season and, below, now closed for refurbishment. Pictures: Yanni

THE state government would have to guarantee the same level of financial support and maintenance of Mornington Peninsula’s six public boat ramps as was provided by the council or any change to their management would not be supported.

This comment comes as Mornington Peninsula Shire reels from a blast by the Futurefish Foundation slamming the standard of its boat ramps. (“Peninsula boat ramps in disarray, says fishing body The News 6/11/18).

The shire has six ramps: Five on Port Phillip at Schnapper Point, Fishermans Beach, Safety Beach, Rye and Sorrento, and one at Hastings. Two sand ramps at Mt Martha and Flinders can be used by tractors and four-wheel-drives only.

Other ramps include Tootgarook (managed by the Capel Sound foreshore committee) and Flinders (run by Parks Victoria).

The foundation’s David Kramer – critical that several of the ramps were either being reconstructed or were otherwise unfit for the start of the annual snapper run – said it was “time for the management of all the peninsula’s boat ramps to be brought under one single boat ramp authority”.

He called on the major political parties to “remove the management of boat ramps away from the Mornington Peninsula Shire, as well as the multitude of committees of management, which ‘claim to look after the smaller boat ramps’”.

The Premier Daniel Andrews also weighed in, saying that, if re-elected, he would abolish all boat ramp parking and launching fees and establish a Better Boating Fund for boat ramp upgrades – effectively taking the responsibility for ramp maintenance away from local councils.

Mornington Peninsula Shire has hit back saying it is “committed to the boat ramps”.

The mayor Cr David Gill said without a “local focus on boat ramp maintenance” the ramps would suffer.

“On average, Mornington Peninsula Shire spends $250,000 on boat ramp maintenance annually,” he said.

“We conduct annual condition assessments on all ramps which enables the shire to program necessary repairs.

“All ramps are inspected throughout the year allowing us to identify issues for rectification. As well, daily inspections during peak periods on high demand ramps ensure the prompt removal of sand that may impact the safe use of the ramps.”

He said capital works, such as the Rye boat ramp upgrade, were an additional “investment” by the shire. The works, to be completed on 30 November, include reconstruction of the three existing boat ramps and an extra ramp, new jetty and realignment of reversing lanes.

“The shire committed $648,000 towards this project in its 2016-17 financial budget, in addition to funding from the Department of Environment, Land, Water and Planning’s boating safety and facilities program grant of $588,000,” Cr Gill said.

“The … additional lane will reduce peak wait times for boat launching and retrieval from 51 down to 16 minutes.”

Daily fees of $14 go towards ongoing maintenance of all ramps, he said.

The shire’s financial contribution to boat ramps and jetties 2018-19 was $420,000; 2017-18 ($200,000); 2016-17 ($100,000) and 2015-16 ($300,000).

First published in the Southern Peninsula News – 27 November 2018

Related Posts

Police on track to stopping bike hoons

July 26, 2026

Bee plan to improve green spaces

July 24, 2026

VineHop festival secures funding

July 23, 2026

Teens charged over spate of alleged robberies in Mornington

July 22, 2026
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Featured Property

16A Woodland Avenue, Mount Eliza.

Property Of The Week July 16, 2026
Council Watch

Shire to pull out of aged care services

June 11, 2026

Ratepayers foot the bill for public waste costs

April 20, 2026
100 Years Ago This Week

Police raid at Carrum – Three men detained

July 23, 2026
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Competition
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.