Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Thursday, July 3
Breaking News
  • E-bike rider charged following fatal collision in Hastings
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»Solar farm adds to power mix
News

Solar farm adds to power mix

By MP News GroupFebruary 22, 2021Updated:February 24, 2021No Comments2 Mins Read
Picture: Gary Sissons
Share
Facebook Twitter LinkedIn Pinterest Email
Picture: Gary Sissons

MOTORISTS on Peninsula Link may have seen Melbourne Water’s sign, pictured, advertising a proposed solar farm at the Eastern Treatment Plant, Bangholme.

The farm is one of the many ways the authority says it is adapting its operations to “prepare for a changing climate, reducing our own carbon emissions and generating more renewable energy”.

The Eastern Treatment Plant, opened in 1975, treats about 330 million litres of sewage a day – about 40 per cent of Melbourne’s total. It already makes biogas that provides about 30 per cent of the energy needed to run the plant each year; the proposed solar farm will produce a further 10 per cent.

Solar, along with hydropower and bioelectricity, will take the plant a step closer towards halving its emissions by 2025 and, hopefully, reducing them to net zero by 2030.

Works to prepare for the solar farm on Melbourne Water land south of Thompson Road and east of the Mornington Peninsula Freeway began last year and a contract was awarded to Beon Energy Solutions. Construction is expected to begin in coming months.

A potential second solar farm will be built at the Winneke Water Treatment Plant, Christmas Hills. Both solar farm projects are still in the design and planning stages, however the Eastern Treatment Plant farm has been approved and is further developed in its design.

First published in the Western Port News – 24 February 2021

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Advocates celebrate abuse law change

July 3, 2025

Railway station scam

July 1, 2025

Flinders result unaffected by poll blunder – AEC

July 1, 2025

Grand Hotel’s tower revamp signals new chapter for icon

June 26, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

14 Bass Street, McCrae

June 3, 2025
Council Watch

Shire secures $3.9m to tackle road safety

June 16, 2025

Kinder flyer flag snub prompts councillors to take over

June 10, 2025
100 Years Ago This Week

Baxter – On The ‘Wallaby’ with a walking group

July 1, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.