Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Monday, May 12
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»Battery plan to ‘stabilise’ power supply
News

Battery plan to ‘stabilise’ power supply

By Stephen TaylorJuly 26, 2021Updated:July 16, 2024No Comments3 Mins Read
Power grab: This proposed battery plant at Tyabb, artist’s impression below, will make money by buying electricity off-peak and selling it back into the grid on days of high demand. Above, a small sign advising of the plan is displayed at the rural property in Thornells Road. Picture: Gary Sissons
Share
Facebook Twitter LinkedIn Pinterest Email

A MULTI-MILLION dollar battery plant at Tyabb will aim to improve electricity grid reliability and network stability across the Mornington Peninsula.

Australian renewable energy company Maoneng is behind the battery energy storage system – or BESS – to be built on privately-owned land next to the Tyabb sub-station in Thornells Road.

The plant will make money by drawing energy from the grid during off-peak periods when it is cheaper and storing it in batteries, and then dispatching it back to the grid during peak periods when it can charge a premium.

Renewables development director Allison Hawke said this approach to buying and selling energy “meets the dual purpose of supporting a reliable electricity grid while encouraging new investment in these types of projects from companies like ours”.

The plant is expected to provide 150 full time equivalent jobs during its 12 month construction, the company said. It will require one full-time position after that.

Plans for the plant are on public display as Maoneng seeks a builder. Completion is expected in 2022.

The peninsula is subject to fluctuations in demand for electricity, primarily as a result of seasonal tourism, with diesel generators being brought in each summer to top up existing supply (“Diesel back-up on power cut days” The News 1/10/18).

“Like diesel generators, batteries provide demand response to help manage excess power demand and excess generation,” Ms Hawke said. “Batteries charge when there is an oversupply of generation and a very low power price and discharge in times of high demand.

“As the fuel source is very low compared to diesel, battery generation can bid into the power market at a lower price. Batteries therefore help to reduce the cost of running the network and maintaining power supply.

“Back up diesel generation typically kicks in in times when all solar, wind, coal, gas and battery resources are exhausted and demand still exists – a very hot summer evening, for example.”

Maoneng said its project had “no significant environmental impact concerns”.

The company’s co-founder and CEO Morris Zhou said the Tyabb BESS represented an “important piece of the puzzle as Victoria’s renewable energy transition gathers pace”.

“A vital part of the Victorian government’s Renewable Energy Action Plan is the integration of energy storage,” he said.

“Our facility directly supports this strategy and will play a key role in local grid stability.

“As Australia’s electricity grid makes increasing use of renewable generation, we see a bright future for BESS projects. They provide numerous benefits by operating on a commercial basis to deliver long-term sustainable outcomes that support all stakeholders – from local businesses and communities to the state government, regulators and investors.”

The Tyabb BESS public exhibition period follows the company’s recent submission of plans for a BESS at Gould Creek, near Adelaide. The proposed 225MWp/450MWh project is scheduled for completion mid-2023.

The company says it has sponsorship support from the Department of Energy and Mining.

First published in the Southern Peninsula News – 27 July 2021

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Shire steps in to ‘save’ the Hastings Club

May 8, 2025

Ratepayers bear brunt of state cost shifting

May 8, 2025

$2.8m confirmed for landslide so far

May 7, 2025

McCrae couple triumphs in council landslip dispute

May 7, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

36 Matthew Street, McCrae

April 3, 2025
Council Watch

Council invests millions more in shire roads

March 18, 2025

Hastings the ‘preferred location’ for consolidated shire offices – councillors

March 14, 2025
100 Years Ago This Week

A Dangerous Dog – Child claims damages after being bitten

May 6, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.