Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Sunday, May 11
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»More train pain for drivers on way
News

More train pain for drivers on way

By Neil WalkerSeptember 21, 2015Updated:September 21, 2015No Comments2 Mins Read
Need for speed: New faster X’Trapolis trains on the Frankston line mean boom gates at level crossings will be down for longer for safety reasons. Picture: Yanni
Share
Facebook Twitter LinkedIn Pinterest Email
Need for speed: New faster X’Trapolis trains on the Frankston line mean boom gates at level crossings will be down for longer for safety reasons. Picture: Yanni
Need for speed: New faster X’Trapolis trains on the Frankston line mean boom gates at level crossings will be down for longer for safety reasons. Picture: Yanni

DRIVERS’ pain could be train commuters’ gain when eight new X’Trapolis trains take to Melbourne’s rail tracks later this year.

Metro Trains plans to lower boom gates at several level crossings for longer times, including “the majority” of those on the Frankston line, to maintain safety at road and rail intersections since the X’Trapolis trains have quicker acceleration than existing trains.

Boom gates could be lowered for up to 15 seconds longer before any train approaches a level crossing on the Frankston line for safety reasons.

Metro spokeswoman Pauline O’Connor said level crossing timings on the Frankston, Werribee and Williamstown lines will be adjusted.

The crossing timing is specific for each level crossing and needs to be assessed individually, but generally boom gates will go down between one and 15 seconds earlier,” Ms O’Connor said.

“The reason for this is to ensure the safe operation of the level crossing for road, pedestrian and rail users.”

She said “the majority of level crossings along the Frankston line will be affected”.

One X’Trapolis train has been running along the Frankston line since October last year. X’Trapolis trains have been running elsewhere on Melbourne’s rail network since 2002.

Longer wait times for drivers to cross railway lines could cause longer traffic jams during peak travel times.

Metro says all boom gates will close for longer periods “in a staged approach” by mid-November.

The Labor state government has promised to remove eleven level crossings along the Frankston line, by separating road from rail, within eight years.

The eleven Frankston line crossings to be removed are: North Rd (Ormond), Balcombe Rd (Mentone), Centre Rd (Bentleigh), Charman Rd (Cheltenham), Edithvale Rd (Edithvale), Eel Race Rd (Carrum), McKinnon Rd (McKinnon), Seaford Rd (Seaford), Skye Rd (Frankston), Station St (Bonbeach), Station St (Carrum).

First published in the Mornington News – 22 September 2015

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Shire steps in to ‘save’ the Hastings Club

May 8, 2025

Ratepayers bear brunt of state cost shifting

May 8, 2025

$2.8m confirmed for landslide so far

May 7, 2025

McCrae couple triumphs in council landslip dispute

May 7, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

36 Matthew Street, McCrae

April 3, 2025
Council Watch

Council invests millions more in shire roads

March 18, 2025

Hastings the ‘preferred location’ for consolidated shire offices – councillors

March 14, 2025
100 Years Ago This Week

A Dangerous Dog – Child claims damages after being bitten

May 6, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.