Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Sunday, June 7
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
Breaking News
MPNEWSMPNEWS
Home»News»Failure of pier being ‘assessed’
News

Failure of pier being ‘assessed’

By Stephen TaylorJuly 25, 2016Updated:August 1, 2016No Comments4 Mins Read
Facebook Twitter LinkedIn Reddit Threads Email Copy Link
A crane aboard a barge is used to lift 15 tonne concrete panels which broke off Mornington pier during a stome two weeks ago. Picture: Yanni
Share
Facebook Twitter LinkedIn Pinterest Email
A crane aboard a barge is used to lift 15 tonne concrete panels which broke off Mornington pier during a stome two weeks ago. Picture: Yanni
A crane aboard a barge is used to lift 15 tonne concrete panels which broke off Mornington pier during a storm two weeks ago. Picture: Yanni

PARKS Victoria says it has “full confidence in the structural integrity and longevity of Mornington pier” despite losing nine wave screen panels, top deck planking, handrails and a seat in a storm two weeks ago.

The 15 tonne concrete panels were torn from the pier during the Tuesday 12 July storm when 60 knot winds were recorded.

Port Phillip and Westernport chief ranger Reece Taranto said damage was restricted to the wave panels attached to the $18 million pier – not the structure itself.

He said a marine contractor made an early morning assessment the day after the storm and arranged for a barge and crane to be floated in to lift the panels out.

Divers working down below in a “weather window” on Wednesday and Thursday last week hitched the damaged panels to a crane which hoisted them onto semi-trailers to be taken to a Mornington warehouse to be assessed.

“The outer section of the pier is now closed, but members of the public can access the inner section, including the lower landing, as these areas were not damaged, “Mr Taranto said.

“Once the pier has been properly assessed, we will reopen the areas that are safe to use.

“But, until marine engineers have had a chance to assess the damage and determine the best approach to repairs, it will be difficult to put a timeframe on when repairs will be completed.”

Mr Taranto said marine engineers were determining the best approach to strengthening the panels’ structure before the next big blow.

The pier has wave screens on both sides to protect the harbour from storms that have damaged or destroyed moored boats several times since the 1980s.

Despite the high cost of the pier works, the harbour still remains unprotected from storms coming from the north to northeast.

Successive state governments, through Parks Victoria, have spent about $18.5 million on Mornington pier since 2010. The Labor government spent $3.5 million on the middle, 53-metre section in 2010-11.

Repairs to the outer section – closed in August 2010 after a series of storms damaged pylons and dislodged top deck planks – remained unfunded.

In June 2011, The News reported the outer section was in danger of collapsing after engineers found 20 per cent of the old pylons had failed or were about to fail and were not supporting the top deck. About half of the others were in “average condition” and the outer section was “one big storm away” from becoming irreparably damaged.

In May 2012 the Liberal government announced it would spend up to $15 million to replace the outer section. This was the lion’s share of $23 million in local port infrastructure upgrades that year with Mornington MP David Morris garnering plaudits for his lobbying efforts.

Work to replace the outer section started in early 2014 and was supposed to be finished in time for Christmas, but was delayed due to a combination of bad weather (three big storms) and technical problems.

These included reattaching the concrete wave screens using a different, stronger system by divers who could not work in rough weather.

More than 250,000 people visit the pier every year.

Heavy lifting: Contractors are dwarfed by the concrete panels ripped from Mornington pier during a storm two weeks ago. The panels were secured to the pier structure by bolts which appear to have been pulled loose during the battering by waves. Pictures: Keith Platt

First published in the Mornington News – 26 July 2016

Related Posts

Rosebud op shop’s mission to house families in need

June 6, 2026

My brother died peacefully, and in the manner he chose

June 5, 2026

Portsea pier maintenance works to begin

June 4, 2026

Two arrested in the investigation into alleged financial offences

June 4, 2026
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

8 Birdwood Avenue, Mornington.

Property Of The Week May 19, 2026
Council Watch

Ratepayers foot the bill for public waste costs

April 20, 2026

Shire reforecasts budget after $8.2m shortfall

April 9, 2026
100 Years Ago This Week

Attempt to blow up safe in Stony Point burglary

June 4, 2026
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local Lives & Landmarks
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2026 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.