Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Tuesday, July 1
Breaking News
  • E-bike rider charged following fatal collision in Hastings
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»Truck traffic warning for reservoir works
News

Truck traffic warning for reservoir works

By MP News GroupMarch 16, 2016Updated:March 17, 2016No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

OVER the next 12 months Tyabb reservoir will be turned into two independently operating water basins.

The works will allow workers from Melbourne Water to install two linings and covers while the old cover and lining is removed.

The covers and linings are designed to protect the quality of the drinking water piped from Cardinia Reservoir or Tarago treatment plant.

Melbourne Water has warned there will be extensive truck movements 7am-6pm, Monday to Friday.

Approval is being sought for the trucks to operate 7am-1pm on Saturdays.

Bulk earthworks during what’s described as “an intensive period of 60-100 truck movements each day” – will take place between May and August.

Trucks will enter and exit the reservoir along Flood St.

In 1999 the basin received a polypropylene cover, which complied with Melbourne Water’s “closed system standard” on covering service reservoirs. The basin was lined inside with a similar material.

Age and condition mean the existing cover and liner need replacing. Melbourne Water says the works “will ensure the safety and quality of the water is maintained to a high standard”.

The man-made reservoir is 300 metres by 200 metres – or 60,000 square metres – with a total storage capacity of 317 million litres. It was built by the State Rivers and Water Supply Commission in 1978.

Melbourne Water became the owner in 1991.

First published in the Western Port News – 16 March 2016

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Flinders result unaffected by poll blunder – AEC

July 1, 2025

Grand Hotel’s tower revamp signals new chapter for icon

June 26, 2025

McCrae telco tower refused over visual impact

June 26, 2025

Future on the line for cramped Men’s Shed

June 25, 2025
Add A Comment

Comments are closed.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

14 Bass Street, McCrae

June 3, 2025
Council Watch

Shire secures $3.9m to tackle road safety

June 16, 2025

Kinder flyer flag snub prompts councillors to take over

June 10, 2025
100 Years Ago This Week

Electrification of Trains – Frankston to Mornington Line

June 23, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.