Close Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Read Our Newspapers Online
    • Read the Latest Western Port News
    • Read the Latest Mornington News
    • Read the Latest Southern Peninsula News
    • Read the Latest Frankston Times
    • Read the Latest Chelsea Mordialloc Mentone News
  • Competition
  • Home New
Facebook X (Twitter) Instagram
Thursday, July 3
Breaking News
  • E-bike rider charged following fatal collision in Hastings
Facebook X (Twitter)
MPNEWSMPNEWS
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
Breaking News
MPNEWSMPNEWS
Home»News»Future flood blueprint
News

Future flood blueprint

By Mike HastApril 25, 2013Updated:July 19, 2022No Comments5 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

A BLUEPRINT to cope with climate change flooding in the Rosebud and McCrae area in the short term and over the next 90 years has been released.

The Port Phillip Coastal Adaptation Pathways Program states the benefits of “occupying the hazard zone, deri­ved from its use by residents and busi­nesses, is valued at about $35 million a year between now and 2100” and Mornington Peninsula Shire should start spending money to adapt to pre­dicted sea level rise and significant flooding caused by extreme rainfall.

The adaptation program studied four bayside areas – Rosebud-McCrae, Mor­di­alloc, Elwood and Southbank as well as a low-lying area in North Mel­bourne.

Elements of the report were reported by The News last November (“Rosebud 2010 flood risk”, 1/11/12) including that it could cost $100 million to pro­tect Rosebud and McCrae.

Last September, shire CEO Mi­chael Kennedy told councillors the gap between the cost of retreat and adap­tation was so great “it’s not a tough call”. Adaptation was the cheaper op­tion. The study said it would cost $100 million to adapt “but we say it is less”.

The report came to light last year after shire councillors held a private meeting that was accidentally taped and put on the shire’s website.

The adaptation report states the cost of coping with flooding could be $9 million a year if the shire does nothing now.

The Murray-Anderson Catchment span­ning Rosebud and McCrae was the area chosen by the shire for the study.

It is about 274 hectares and contains 2605 properties, mostly homes with some commercial properties along the foreshore.

The study says the catchment “cur­rently experiences significant flooding (covering more than 74 per cent of land parcels) predominately as a result of extreme rainfall in the local catchment, which is expected to increase in ex­tent and depth as a result of climate change”.

The predicted flooding has implica­tions for construction of homes and commercial buildings on or near the fore­shore, including the proposed Sou­thern Peninsula Aquatic Centre plan­ned for the Rosebud foreshore near Rosebud Memorial Hall.

The study says that without adapta­tion, “the current cost of flooding is expected to increase from over $7 million to more than $9 million per year under the assumed climate change scenario”.

“As such, the annual value of occu­py­ing the hazard zone by 2100 is three times greater than the expected costs of flooding.

“For this area, the most economically favourable adaptation pathway is to improve resilience to current flood events while reducing risk from the cur­rent 100 year ARI flood events.

“ARI is average recurrence interval, the expected time between the events that exceed a given value (for example rainfall or wave height). Also referred to as the ‘return period’, it is usually expressed in years. For example, the 1-in-100 year rainfall experienced du­ring a storm event will on average only be exceeded once every 100 years. How­ever, it does not mean it cannot happen more, or less, frequently than every 100 years.”

Maps in the study show flooding in large areas of Rosebud between Jetty Rd and Lonsdale St, and parts of McCrae east of Lonsdale St.

This would occur during a “perfect storm” of coastal flooding combined with heavy rains when stormwater would not flow into Port Phillip.

The study contains a cost-benefit analysis of whether to “retreat” or “adapt” as sea level rises, storms in­crease and more heavy rainfall events occur.

Suggestions in the study include:

Increase the height of Mornington Peninsula Freeway to act as a flood barrier for runoff coming from Arthurs Seat.

Improve shire and community aware­ness, preparedness and recovery from flood events.

Continue to improve drainage in con­junction with Melbourne Water. “This is likely to be the most cost-effective approach to reduce current and future flood risks.”

Protect or move “a number of critical community assets” in the hazard zone. “Damage or loss of these assets will affect key public services and amenity.”

Future flood risk should be consi­dered in council’s planned changes to LSIO [land subject to inundation overlay] boundaries.

Roles and responsibilities for adap­tation need to be defined between rele­vant organisations, including state and local government. Responsibilities will change over time as the impacts of cli­mate change become more severe.

Regular monitoring and review of inundation risks should be integrated into existing council strategies and plans, including climate change action plans, drainage management plans, muni­cipal strategic statements and precinct plans.

“This analysis supports the decision that retreating from the entire study area is not a viable adaptation ap­proach,” the study says.

“However, a similar economic ana­ly­sis at an individual land parcel level may provide different results and there­fore retreat at the micro level may be appropriate to consider for higher risk areas.”

The study was prepared for the Muni­cipal Association of Victoria with the cooperation of councils and fund­ed by the federal government’s Department of Climate Change and Energy Efficiency.

Last year the government’s climate change department said almost 250,000 coastal homes worth more than $60 billion were at risk of flooding from sea level rise over the next 90 years

blueprint climate change flooding future hazard McCrae prevention Rosebud
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Advocates celebrate abuse law change

July 3, 2025

Railway station scam

July 1, 2025

Flinders result unaffected by poll blunder – AEC

July 1, 2025

Grand Hotel’s tower revamp signals new chapter for icon

June 26, 2025
Add A Comment
Leave A Reply Cancel Reply

You must be logged in to post a comment.

Peninsula Essence Magazine – Click to Read
Peninsula Kids Magazine – Click to Read
Letters to the Editor
Property of the Week

14 Bass Street, McCrae

June 3, 2025
Council Watch

Shire secures $3.9m to tackle road safety

June 16, 2025

Kinder flyer flag snub prompts councillors to take over

June 10, 2025
100 Years Ago This Week

Baxter – On The ‘Wallaby’ with a walking group

July 1, 2025
Interview

Firefighter shows skills from sea to snow

February 5, 2024
Menu
  • Home
  • News
  • Sport
  • Entertainment
  • Local History
  • Contact Us
  • Advertise With Us
  • About Us
  • Subscribe
  • Home New
About

Established in 2006, Mornington Peninsula News Group (MPNG) is a locally owned and operated, independent media company.

MPNG publishes five weekly community newspapers: the Western Port News, Mornington News, Southern Peninsula News, Frankston Times and Chelsea Mordialloc Mentone News.

MPNG also publishes two glossy magazines: Peninsula Essence and Peninsula Kids.

Facebook X (Twitter)
© 2025 Mornington Peninsula News Group.

Type above and press Enter to search. Press Esc to cancel.